Wednesday Crew

Wednesday, April 3, 2013 


Our list for this week -

1. Track work continues

2. Finish painting the building

3. Install the shade covers in the infield.

4. Install the last window in the RPO

5. Remove the fuel tank from the crew speeder so it can be cleaned.

6. Clean up the infield? 

7. Check the chairs and tables for loose screws and bolts.

8. Clean train car seats.

9. Install window covering in N&W caboose.

 The 1st picture is the drink machine with the extra rides posted.

The last picture has Kevin Hooks watching the CSX train.  Notice the steam tower in the background.



Make a free website with Yola