Wednesday Crew

 

Conductor’s check list  (Draft document Not approved 9/5/11)

 

Brake test

Ask engineer to signal 5 minutes before departing

Release brakes

Lift flipper boards up

Notify engineer train is ready to depart

 

Notify Bonsal when leaving the yard.

Notify Bonsal at Midway crossing

Notify Bonsal of car count.

Notify Bonsal of arrival at New Hill yard.

 

Set brakes NOT on car 201!

Release Locomotive to north switch

Open brake valve on caboose

 

Stop locomotive 10 feet from caboose

Open coupler on locomotive

Center Coupler

Lift pin on coupler

Couple to caboose

Connect air hose

Open engine air valve

 

After engine air pressure has stabilized, do brake test

Note car 201’s brake should not be set.

Note: at least 30 lbs. of pressure must be used to set brakes.

Notify engineer train is ready to depart

 

Notify Bonsal upon leaving New Hill Yard

Notify Bonsal upon reaching Midway crossing

Request permission to enter Bonsal yard.

 

Spot train at platform.

Clear train of passengers

Couple next engine or load passengers

Couple next engine or load passengers

 

 

Make a free website with Yola