Conductor’s
check list (Draft document Not approved 9/5/11)
Brake test
Ask engineer to signal 5 minutes before departing
Release brakes
Lift flipper boards up
Notify engineer train is ready to depart
Notify Bonsal when leaving the yard.
Notify Bonsal at Midway crossing
Notify Bonsal of car count.
Notify Bonsal of arrival at New Hill yard.
Set brakes NOT on car 201!
Release Locomotive to north switch
Open brake valve on caboose
Stop locomotive 10 feet from caboose
Open coupler on locomotive
Center Coupler
Lift pin on coupler
Couple to caboose
Connect air hose
Open engine air valve
After engine air pressure has stabilized, do brake test
Note car 201’s brake should not be set.
Note: at least 30 lbs. of pressure must be used to set brakes.
Notify engineer train is ready to depart
Notify Bonsal upon leaving New Hill Yard
Notify Bonsal upon reaching Midway crossing
Request permission to enter Bonsal yard.
Spot train at platform.
Clear train of passengers
Couple next engine or load passengers
Couple next engine or load passengers